STENTER FRAME
Stenter Frame ensures proper transportation & heat treatment of fabric
- Uniflo Air Circulation System
- Newly developed Fan house and Patented Uniflo Nozzle provides up to 15% higher drying efficiency with same power consumption compared to earlier design
- 2 numbers circulation fans per chamber will be provided; one for air flow from top nozzle and one for air flow from bottom nozzle
- Common AC Inverter Drive (VFD) will be provided between 2 upper or 2 lower circulation fan motors
- As a standard circulation fan motors up to 1500 rpm will be provided; as an option circulation fan motors up to 1750 rpm is available
- Nozzles are drawable hence can be pulled out easily from doors for cleaning
- Pneumatic Bypass System can be provided as an option; this system will help in reducing nozzle marks and yellowing of fabric during small machine stoppages
Fan House CFD Analysis
Nozzle CFD Analysis
Pneumatic Bypass System
Air Circulation System
- Chain & Track System
- Separate drive for Left and Right Chain; duly synchronised by encoder system
- Horizontally reversed chain with side lubrication facility with metaloplast / engineered plastic bush; duly greased with long-life grease
- Re-greasing is required only after 6000-8000 working hours (depends on average working temperature and speed)
- Steel Fabricated Track with Graphite Rail will be provided
- Special Shock Absorbers are provided for smooth turning of chain
- Less Friction as graphite is self-lubricating material
- Fabric Protection Pipe can be provided to ensure higher overfeeding of fabric
- Top side graphite rail enables chain to stretch the fabric up to desired level
- Sturdy Track & Chain Design ensures high speed (up to 150 MPM) and higher stretch ability
- 3 different types of chain can be supplied; Pin type, Clip type and Pin & Clip (Combi) type
Pin type Chain
Clip type Chain
Combi type Chain
3D view of Chain & Track Assembly (with protection pipe)
- Width Adjustment System
- Lube free width adjustment spindle above fabric operated by separate geared motor is provided at every 3 meters
- Width control and display by encoder system
- Software & Hardware Limit for Spindle Safety is provided
Width adjustment
- Chamber Construction
- 400 mm long Isotherm zone is provided at entry & exit of chambers to prevent fabric from thermal shock and it helps in preventing condensation
- Each treatment field is 3 meters long
- Space saving construction
- Foundation pits not required
- Minimum utility work as all circulation fans are on one side of the machine
- 150 mm thick high thermal insulation on 3 sides of the machine; 100 mm thick high thermal insulation on floor
- All Insulation Panels are powder coated with special rust preventive powder for better life
4 numbers fixed filters per chamber and four numbers flexible filters per chamber (flexible filters can be pulled out during production for cleaning purpose)
- Teflon shutter at the fabric inlet and outlet openings to prevent fresh air entry in to the chambers
- As a standard 2 numbers hinge type doors per chamber is provided; Pneumatic Lifting doors as option is available
Filter & Door
Cross sectional view of chamber
Better Insulation; Lesser Radiation Loss
- Heating Media
3 different types of Heating Media can be provided in Stenter machine; Indirect Oil Heating, Direct Gas Heating and Indirect Steam Heating
- Indirect Oil Heating
- 3 Meter Long One Heat Exchanger (Radiator) per Chamber will be provided
- Large Heat Exchanger Surface Area for quick heating
- Uniform Heat Transfer and Lesser Pressure Drop due to its Unique Design
- PID controlled Motorised Valves (for better temperature control & energy saving) along with Manual Globe Valves, Flanges, Gasket & Hardware can be provided if required
- Oil Flow Meter (Energy Meter) can be provided if required
- Direct Gas Heating
- 1 number Maxon (Honeywell) / Riello make Burner will be provided per Chamber
- Automatic Burner with Higher Turn Down Ratio leads to energy saving
- T Tube of SS 310 inside the chamber will be provided for safety from burner flame
- Pressure Switch for safety will be provided in exhaust duct
- Gas Train can be provided if required
- Indirect Steam Heating
- 3 Meter Long One Heat Exchanger (Radiator) per Chamber will be provided
Large Heat Exchanger Surface Area for quick heating
- Steam Line Parts (Motorised Valve Assembly, Condensate Assembly, Condensate with Bypass Assembly etc.) can be provided if required
- Steam Flow Meter (Energy Meter) can be provided, if required
Gas Burner
Gas Train
Oil Line Parts
- Exhaust System
- Stenter Machine with Integral Exhaust Duct and External Exhaust Duct can be provided
- 1 suction fan with inverter will be provided for stenter machine up to 4 chambers
- 2 suction fans with separate inverters will be provided for stenter machine from 5 to 12 chambers
- Manual Dampers will be provided for control of exhaust air from each chamber
- Easy Cleaning is possible in case of Integral Exhaust Duct
External & Integral Exhaust Duct 3D view
- Fabric Exit from Chain
- Outlet Track Support
- Outlet Track of Length 1980 mm, 2820 mm and 3440 mm will be provided as per requirement
- Cooling Zone of 800 mm length with 5.5 kW motor Or 1000 mm length with 7.5 kW motor will be provided as per requirement
- Fabric Depinning Device will be provided
- Limit Switch for Fabric Safety will be provided
- Pin Cleaning Device, Clip cleaning Device, Edge Trimmer BTA 8013 / Weko 2.0 can be provided if required